industrial wastewater treatment project for industrial parks in Textile

Textile Industry Parks Wastewater Treatment Project

This is the industrial wastewater treatment project for industrial parks in Textile. Center Enamel had successful installed 23 pcs of Glass-Fused-to-Steel Tanks with the total storage capacity of 31,000m³ at 3(three) wastewater treatment plants in Ethiopia by November 2018! These GFS tanks will be used to store water for production or treat sewage generated from various factories within these industrial parks. These Center Enamel’s GFS tanks will contribute to the realization of zero liquid discharge wastewater treatment plants.

Location Ethiopia
Project Details 23 tanks for 3 textile industrial parks WWTP at Adama, Dire Dawa and Addis Ababa
1 set of tank Ø 12.23*4.8m
1 set of tank Ø19.87*6.0m
1 set of tank Ø23.69*7.2m
2 sets of tank Ø25.22*4.8m
3 sets of tank Ø 24.46*6.0m
1 set of tank Ø19.11*6.0m
1 set of tank Ø8.41*4.2m
2 set of tank Ø6.88*3.6m
1 sets of tank Ø13.76*6.0m
2 sets of tank Ø28.28*7.2m
5 set of tank Ø3.82*3.6m
1 set of tank Ø17.58*6.0m
1 set of tank Ø4.59*3.6m
1 sets of tank Ø6.88*3.6m
Tank color dark blue, dark green, white
Roof type aluminum alloy roofs
Installation 12 installation consults for 3 project spots, finished on 2018