logo.png

sales@cectank.com

86-020-34061629

English

Center Enamel Provides Glass-Fused-to-Steel Tanks for Mexico’s Playa del Carmen Wastewater Treatment Project

Created on 2024.08.13
0

Center Enamel Provides Glass-Fused-to-Steel Tanks for Mexico’s Playa del Carmen Wastewater Treatment Project

Center Enamel is proud to announce our successful contribution to the Playa del Carmen Wastewater Treatment Project in Mexico. Our advanced Glass-Fused-to-Steel (GFS) tanks have played a crucial role in the efficient management and treatment of wastewater, demonstrating our commitment to delivering high-quality solutions for essential environmental infrastructure.
Project Overview
Application Areas: Wastewater Treatment
Location: Playa del Carmen, Mexico
Total Tank Volume: 178 cubic meters
Tank Size and Quantity:
The result is 33.024 million cubic meters.
2019
Operation Status: Construction completed and operational
Project Significance
The Playa del Carmen Wastewater Treatment Project addresses the vital need for effective wastewater management in a region known for its vibrant tourism industry. By incorporating Center Enamel’s GFS tanks, the project enhances the capacity and efficiency of local wastewater treatment facilities, contributing to improved environmental protection and resource management.
Center Enamel的GFS罐为什么选择?
优越耐久性:我们的玻璃钢罐设计用于经受污水处理的苛刻条件。玻璃钢涂层具有出色的耐腐蚀和化学品暴露抗性,确保长期性能和可靠性。
The smooth, non-porous surface of the GFS tanks helps prevent sludge accumulation and contamination, minimizing maintenance requirements and ensuring consistent operation.
Efficiente rendimiento: Diseñado para una eficiencia óptima, nuestros tanques respaldan procesos efectivos de tratamiento de aguas residuales, mejorando la efectividad general de la instalación de Playa del Carmen.
Compliance with Standards: Center Enamel’s GFS tanks are manufactured to meet rigorous international standards, including  ISO 9001, NSF/ANSI 61, WRAS, CE, ISO 28765, LFGB, BSCI, ISO 45001, ensuring high quality and safety in operations.
Project Highlights
Compact Design: The project features a single tank with a size of φ6.88*4.8M (H), specifically designed to meet the volume and operational needs of the Playa del Carmen wastewater treatment facility.
Operational Success: Since its completion in 2019, the tank has been successfully integrated into the wastewater treatment system, demonstrating the reliability and efficiency of Center Enamel’s GFS tanks.
Quality and Sustainability Commitment
At Center Enamel, we are dedicated to providing innovative, reliable solutions for wastewater treatment and other critical infrastructure projects. Our successful installation at the Playa del Carmen project underscores our expertise and commitment to supporting sustainable and effective environmental management.
For more information about our products and how they can benefit your projects, please visit our website or contact our team. We look forward to continuing to provide top-quality solutions for essential infrastructure projects worldwide.
WhatsApp