logo.png

sales@cectank.com

86-020-34061629

English

Glass-Fused-to-Steel Tank for Palm Oil Wastewater Treatment Projects

Created on 02.25
Glass-Fused-to-Steel Tank for Palm Oil Wastewater Treatment Projects

GFS Tank for Palm Oil Wastewater Treatment: Dealing With High-Strength Effluent

A GFS tank for palm oil wastewater treatment uses a vitreous enamel coating fired at 820 to 930 degrees C that resists the acidic, high-BOD, high-temperature effluent better than painted steel, provided the enamel grade matches the stream chemistry.
Palm oil mill effluent is hot, acidic and biologically aggressive, so the tank lining decides the project life. This article explains why glass-fused-to-steel is a sound choice and what to specify.

Technical Explanation

Why the coating matters

· POME carries organic acids and sulfides that attack ordinary paint films; the inert glass layer on GFS does not soften or peel in that environment.
· The enamel formula is chosen for the expected pH and chloride range, which is why a generic coating spec is a mistake for this duty.

Process fit

· GFS tanks serve equalization, anaerobic digestion and treated-effluent duty in palm mills because they bolt together fast and resist the wet, tropical exposure.
· Panel stiffness and sealant grade are selected for the retained liquid density and any gas pressure from digestion.

Technical Specifications

Table 1 - Glass-fused-to-steel tank specification factors

Duty
Coating requirement
Design note
Equalization
Acid-resistant enamel
Mix and buffer flow
Anaerobic
Gas-tight seal
Withstand biogas pressure
Treated effluent
Standard GFS enamel
Long outdoor life
Temperature
Heat-stable frit
POME runs warm
Foundation
Ring beam
Bolted shell load

Project Case Study

Project Case Summary - delivered water storage tanks

The deliveries below are representative bolted storage tank projects in glass-fused-to-steel, fusion bonded epoxy and stainless steel construction, with capacity, location and completion date recorded for each order. They illustrate the company's delivered capability for the type of storage tank, roof or cover discussed in this article.
Project
Application
Capacity
Construction
Roof
Completion
Saudi Arabia
Firefighting water
492 m3
Fusion bonded epoxy
Aluminium flat roof
2024-11
Guinea
Firefighting water
1,983 m3
Hot-dip galvanized tank
Aluminium flat roof
2025-12
Panama
Firefighting water
268 m3
Glass-fused-to-steel bolted
Aluminium dome
2024-06

Company Expertise

Center Enamel (Shijiazhuang Zhengzhong Technology Co., Ltd) manufactures bolted GFS palm oil wastewater tanks in glass-fused-to-steel, fusion bonded epoxy and stainless steel, engineered to AWWA D103-09 with the enamel coating process controlled to ISO 28765.
Center Enamel delivers glass-fused-to-steel tanks engineered for aggressive effluent, with the enamel formula selected against the specific pH and chloride of the waste stream.

Frequently Asked Questions (FAQ)

Q: Why not painted welded steel for POME?
A: POME acids and sulfides quickly undercut paint; GFS vitreous enamel is far more stable in that chemistry.
Q: Does GFS handle the heat of palm effluent?
A: The enamel is fired at 820 to 930 degrees C so process warmth is well within its service range.
Q: Can the tank hold biogas pressure?
A: Yes when specified as gas-tight with a suitable roof and sealant for anaerobic duty.
Q: Is GFS faster to build than concrete?
A: Bolted GFS panels assemble on site much faster than cast concrete and need no curing wait.
Q: What capacity suits a palm mill?
A: Equalization and digestion volumes scale with throughput; GFS tanks are built modular from tens to tens of thousands of cubic metres.
Q: How is corrosion at the waterline handled?
A: The continuous enamel layer removes the coating breakdown that causes waterline corrosion in painted tanks.
For palm oil wastewater, the tank lining is the project. Glass-fused-to-steel earns its place where acidic, warm, high-BOD effluent would destroy lesser coatings.

Request Technical Specifications

Send your duty, capacity requirement and site conditions, and we will return the tank configuration, coating specification and documentation schedule for your project file.
WhatsApp