Production Steps
At Center Enamel, the fusion of steel and glass is critical for the durability of our Glass-Fused-to-Steel tanks. We ensure high-quality products through strict quality control at every stage.
Before mass production, we test raw materials and samples to check the fusion quality. Only after passing these tests do we proceed to full production on our automated production line, ensuring consistent quality. After production, every steel panel undergoes a 1500V spark holiday test to ensure no defects, guaranteeing top performance and durability.
Arch Bending
Inputting the Confirmed drawing into the computer, bolt holes and openings will be cut by CNC laser cutting machine automatically.
After shot blasting, steel panel needs to be arch bent to a radian according to tank diameter.
Automatic Enamel Spraying
High Temperature Tunnel Oven
Steel Pre-treatment - Shot Blasting
After enameling and drying, then firing steel panels in the oven at the temperatures ranging from 820℃ -930℃, which facilitates the interfacial fusion reactions that combine the two materials.
CNC Laser Cutting
Spray the glass coating on both sides of steel panels automatically. Coating thickness is controlled within 230 microns to 450 microns.
Shot blasting according to SSPC SP10 standard, steel surface is in silver white color
Product Inspection
Quality inspection needs to be conducted after production, including coating thickness, holiday test, color consistency.
Shijiazhuang Zhengzhong Technology Co., Ltd
Products
Glass Fused to Steel Tanks
Fusion Bonded Epoxy Tanks
Stainless Steel Tanks
Galvanized Steel Tanks
Aluminum Dome Roofs
Storage Tanks Roofs
Tank Ancillaries
Applications
Drinking Water Tanks
Industrial Wastewater Tanks
Anaerobic Digester
Leachate Storage Tanks
Agricultural Water Tanks
Fire Water Tanks
Dry Bulk Storage Tanks
Municipal Sewage Tanks
About Us
About Us
Quality Control
Production Steps
Certifications
Services
Resource
News
Project Cases
Contact Us
86-020-34061629
sales@cectank.com