logo.png

sales@cectank.com

86-020-34061629

English

Center Enamel Provides Glass-Fused-to-Steel Tanks for Azelik Uranium Deposits Fire Water Storage Project

Created on 2024.04.01

Center Enamel GFS Tanks for Azelik Uranium Deposits Project in Niger

Center Enamel Provides Glass-Fused-to-Steel Tanks for Azelik Uranium Deposits Fire Water Storage Project

Center Enamel continues to demonstrate its global engineering expertise in providing reliable and durable water storage solutions through its involvement in the Azelik Uranium Deposits Water Storage Project in Niger. Essential for managing service water, fire suppression, and environmental compliance at a remote mining site, this multi-tank installation highlights Center Enamel's capability to deliver high-performance containment systems under demanding industrial conditions.

Comprehensive Water Storage Solutions for Mining Operations

Located in Azelik, Niger, the uranium mining development required a multi-faceted liquid containment infrastructure to cover emergency fire protection, potable hydration for onsite personnel, and strict wastewater management. In November 2009, Center Enamel successfully completed the delivery of six sets of Glass-Fused-to-Steel (GFS) tanks tailored to these exact requirements:
● Fire Water Storage: Three sets of GFS tanks ( 9.93m x 3.6m) engineered to ensure a continuous, high-volume water supply for active fire suppression and emergency rescue systems.
● Drinking Water Storage: Two sets of large-capacity tanks ( 19.86m x 4.8m) designed to safely store potable water for personnel, meeting strict human consumption standards.
● Wastewater Storage: One set of containment tank ( 9.93m x 4.2m) dedicated to managing site wastewater, facilitating proper environmental stewardship and regulatory compliance.
● Design & Aesthetic Features: Finished in distinct white and forest green color schemes with specialized FRP roofs and open roof configurations, optimized for desert environmental conditions.

Strategic Partnership with China National Nuclear Corporation (CNNC)

Executed in collaboration with the China National Nuclear Corporation (CNNC), this landmark project underscores Center Enamel's trusted reputation in executing complex, large-scale international engineering contracts. Beyond manufacturing the prefabricated bolted panels, Center Enamel deployed expert installation supervisors directly to the remote site in Niger to oversee assembly, ensuring seamless integration, structural integrity, and immediate operational readiness.

Comparative Matrix: Remote Industrial Storage Technologies

Evaluation Parameter
Center Enamel Glass-Fused-to-Steel (GFS) Tanks
Cast-in-Place Concrete Reservoirs
Conventional Welded Carbon Steel Tanks
Logistics & Deployment in Remote Regions
Modular bolted panels pack efficiently into standard freight containers for long-distance international transport
Requires massive local aggregate, heavy cement batch plants, and intensive local civil logistics
Heavy, rigid steel sections requiring complex and expensive overseas freight handling
On-Site Installation Speed
Rapid modular erection using lightweight tools and local crews under supervision
Extremely slow civil construction requiring long curing cycles in harsh climates
Slow field construction requiring specialized manual welding and coating crews
Environmental & Weather Resistance
Inert glass surface completely resists intense UV radiation, high temperatures, and corrosion
Vulnerable to concrete micro-cracking, shifting, and structural spalling
High susceptibility to exterior oxidation and pitting in extreme arid/saline climates
Expected Service Lifespan
30 to 40+ Years of low-maintenance industrial performance
30 to 50 Years (subject to structural concrete settling)
10 to 20 Years (requires continuous field recoating and maintenance)

Frequently Asked Questions (FAQ)

Q: What was the scope of Center Enamel's project at the Azelik Uranium Deposits?
A: Center Enamel supplied a total of six sets of Glass-Fused-to-Steel (GFS) tanks, comprising three fire water tanks (9.93m x 3.6m), two drinking water tanks (19.86m x 4.8m), and one wastewater tank (9.93m x 4.2m).
Q: Who was the primary project partner for the Azelik water storage deployment?
A: The project was executed in close collaboration with the China National Nuclear Corporation (CNNC) in November 2009.
Q: Why are GFS tanks ideal for remote industrial and mining sites like Niger?
A: GFS tanks feature a modular bolted design that allows them to be packed into standard shipping containers and transported easily to remote locations. Their fused glass-steel surface provides exceptional resistance to harsh weather and corrosion without needing complex field maintenance.
Q: What types of roofs were utilized for the Azelik project tanks?
A: The tanks utilized FRP (Fiberglass Reinforced Plastic) roofs and open-top configurations, customized to match the specific containment requirements for fire suppression, potable water, and wastewater management.
WhatsApp